Metal Stud Framing Contractor Phoenix | Gino Builder

Phase 01 · Metal stud framing

Metal stud framing,
plumb and on schedule.

Wood and metal stud framing across the Valley, to full warehouse height. The crew that frames it boards and finishes it.

Licensed · Bonded · Insured · ROC 365519

What we frame.

Wood and metal stud, load-bearing and partition. Framed plumb the first time, so every trade after us starts on a true wall.

01

Warehouse & industrial

Tall demising and partition walls in warehouse bays, framed off scaffold to full height, tied to the structure.

02

Retail & tenant improvement

Storefront build-outs and interior partitions, framed around existing utilities and ready for inspection.

03

Office & corridor systems

Class A office layouts, rated corridors, soffits and bulkheads — clean, plumb, and true to the drawings.

04

Structural & load-bearing

Load-bearing steel stud assemblies, shaft walls and rated partitions — engineered layouts framed to spec and to the inspector.

Framing, up close.

Real projects across the Phoenix Valley. Metal stud, tall walls, framed around what’s already set.

How a framing job goes.

01

Walk & bid

We walk the plans and the site, then put a line-by-line number on it — free, with exclusions written down.

02

Lay out

Track and layout to the drawings, checked against what's already set on site before a stud goes up.

03

Frame

Our crew frames to full height, plumb and true, tied to structure and framed around the mechanical.

04

Hand off

Straight into drywall — our crew — so the wall stays true from stud to finish. No seam.

Free quote · no obligation

Send us the framing plans.

Send the plans or call. We walk it, quote it free, and give you a start date you can build around.